
The test center Windtestfeld Nord welcomes its newest occupant.
Senvion has now installed a prototype of its turbine from the series titled 3.6M140 EBC at the wind turbine center in the northern German town Husum. Besides capacity of 3.6 MW, the turbine is equipped with the new system Eco Blade Control (EBC), writes the manufacturer.
Already a subscriber? Log in.
Read the whole article
Get access for 14 days for free.
No credit card is needed, and you will not be automatically signed up for a paid subscription after the free trial.
- Access all locked articles
- Receive our daily newsletters
- Access our app