
GE has jumped onto the 4 MW bandwagon. The US turbine manufacturer is launching a new turbine with a capacity of 4.8 MW, which can be placed on a 161 meter tower and has a rotor diameter of 158 meters, writes GE in a statement. This means a tip height of 240 meters.
"The LCOE race ever ends," says Pete McCabe, CEO of GE's onshore wind business, according to Windpower Monthly, referring to the industry's new key phrase: levelized cost of electricity.
Already a subscriber? Log in.
Read the whole article
Get access for 14 days for free.
No credit card is needed, and you will not be automatically signed up for a paid subscription after the free trial.
- Access all locked articles
- Receive our daily newsletters
- Access our app